Configuration Managementver. 2.0.0 |
Abstract |
|||
|---|---|---|---|
Purpose
|
|||
Reason
The correctness of the status assigned to each item has a paramount importance. Therefore, the assets' evaluation can be based (for example) on the following criteria:
|
|||
BusinessEach document produced by the project is an asset. This document provides guidelines for supplying all users with the updated version of these items. |
ProjectIts purpose is to set usable guidelines for setting and maintaining each output in the best conditions. The system grants the correct access to the user in relationship with their rank and function. |
||
Topic |
|
|---|---|
ScopeThe "blue-print is created at company's level, then specific needs (either
for the program or the project) can be dealt within the existing frames (tools and
processes). VisibilityThe document itself is rather sensitive. This suggests a visibility limited to the Snr Management |
|
Negotiators' profiles
|
|
Mapping the concepts and its services
|
Elements benefitting from the system
Common features
|
Actors |
||
|---|---|---|
Roles
|
RACI
|
(Notes for) Mandates
|
Operations' description |
RACI model |
Ex |
SME |
PM |
BA |
SH |
|---|---|---|---|---|---|---|
|
Assessment of the situation:
|
C |
A |
R |
C |
C |
|
|
Planning the "Configuration Management Register". |
C |
R |
A |
C |
C |
|
|
Verifying that all necessary information is consisted with the company’s current standards. |
C |
R |
A |
C |
C |
|
|
Approving |
C |
I |
A |
I |
I |
|
|
Manning / updating the system |
I |
R |
A |
I |
I |
Quality |
|
|---|---|
|
The policies (from which arrangements can be set for specific situations – e.g. localization for security reasons) must be consistent with the corporate or program strategy. The operational rules will be checked against the existing / proposed reality. These are the involved subjects and the interested areas: |
|
Technical / Operational
|
Business / Organizational
|
Major Items |
|
|
|---|---|---|
Sources |
||
|
Configuration Management Strategy |
||
| Location | Servers’ addresses both logically and physically (where the system is located). | |
| System properties | All references (name, version) to the software used. | |
| Identification policies | All involved areas (technical, support, clerical, management etc.) have a common/specific naming system. | |
| Checking item status | All policies and processes to assign the correct status to each item are in working conditions. | |
| Approving statuses | Any item has to be classified in relation with the approvals received. The statuses will be set in the Quality Plan. | |
| Planning audits | These operations can have many different scopes. They span from testing the system’s reliability to charting the progresses in a specific production’s area. | |
| Reporting methods | An example is offered by the mail-merge system fed by specific queries. The layouts of the reports will be presented in the “Communication Management Strategy”. | |
| Major Risks |
|
|
| Approved | Project Manager | |